Today InCoral Gables
Issue 27Friday, September 11, 2026

The budget proposal grows to $323.3 million

Where the added money would go, coastal tide precautions and free open studios.

Sewer pipes, waterway dredging and environmental remediation each account for $900,000 in additions to Coral Gables’ proposed budget. The first public hearing on the revised spending plan is September 15, with the property-tax rate still up for a vote.

The big story

The fiscal 2027 plan is $4.86 million larger than July’s proposal, according to the Gazette’s September 10 report. Added capital funding includes $900,000 apiece for sewer-pipe rehabilitation, Ponce Corridor waterway flood mitigation and dredging, and environmental remediation at 72nd Avenue.

The proposed property-tax rate remains 5.559 mills. Rising taxable values mean it would bring in more revenue; the rate is 6.94% above the calculated rate for roughly flat revenue from the existing tax base. July’s unanimous vote set a tentative ceiling, and commissioners can still lower it before adoption.

The first hearing is September 15 at 5:01 p.m. in the Community Meeting Room at Police and Fire Headquarters, 2151 Salzedo St. Advance comments can go to cityclerk@coralgables.com. The final hearing is scheduled for September 29.

Around town

Check bridge clearance before leaving the dock

For boating on Coral Gables’ waterways, higher tides mean less clearance under bridges. Miami-Dade advises checking the tide before leaving the dock during its predicted September 10–13 king-tide period.

Along the city’s coast and very low-lying areas near waterways, heavy rain, strong winds or large waves can worsen flooding. If a road is flooded, take another route; the county warns against driving through floodwater because it can damage vehicles.

A tighter circle around DeSoto Fountain

At DeSoto Plaza, every approach except Granada Boulevard has stop signs. The city’s redesign would shift to yield controls, remove pavement and widen the landscaped apron around the fountain.

Staff outlined the plan at the August 27 Transportation Advisory Board meeting, reported by the Gazette September 7. Sidewalks and crosswalks would extend around the circle, including access for people heading to Venetian Pool.

A $1 million state transportation grant would fund the project. The city anticipates construction in late 2027 or early 2028 and plans to assess the fountain’s condition before work begins.

PVOLVE’s Plaza studio is still in presale

Founding memberships are available for the future location at 3011 Ponce de Leon Boulevard, which the Gazette reported September 3 was expected to open before the end of 2026. PVOLVE’s Sculpt classes combine low-impact movements with resistance equipment; its website also links to pop-up class bookings.

Source: PVOLVE
Make plans

Fire Station 1 marks the September 11 anniversary

When
Friday, September 11, 2026 · 8:30–9:00 AM
Where
Coral Gables Fire Station 1
Address
2151 Salzedo St., Coral Gables, FL 33134

Coral Gables’ fire and police departments will gather to mark 25 years since the September 11, 2001 attacks.

Books made from fabric, fiber and thread

When
Friday, September 11, 2026 · 6:00–9:00 PM
Where
Red Thread Art Studio
Address
283 Catalonia Ave., Coral Gables, FL 33134
Price
Free

Meet resident artists and see their workspaces during Red Thread’s September Open Studios, held alongside Unthreaded Stories. The exhibition’s artists use paper, fabric, stitching and sculpture to turn books into textile objects.

Aurora Molina founded the studio, which is home to 15 artists working with fiber, textiles and other materials.

Get Today in Coral Gables in your inbox.

Know your city. We send the stories, meetings, openings, and weekend notes worth having before you make plans.